THIS FIRST class indoor netball facility Waverley Netball opened in 1994 but by 2008 it was time for a major overhaul. To best suit the building layout, an adjacent through car FreedomLift, complete with an aluminium shaft was the perfect choice for providing access between floors. The shaft, doors, profiles and cabin walls were all done in white for clean finish and to match the surrounding areas. To cap it off, the builders supplied a gyprock roof to the top of the shaft for a striking visual effect and to also tie in with the other sloping ceilings.